The subject of the contract is the supply and assembly along with the design and commissioning of installations using renewable energy sources (RES) for the needs of electricity and heat consumption by residents of the Jarosław Commune and the Roźwienica Municipality.
Part 1: Supply and installation of photovoltaic installations for private residential buildingsPart 1: Supply and installation of photovoltaic installations for private residential buildings: preparation of installation design documentation, delivery of equipment and installation elements, on-site installation of the installation together with the accompanying infrastructure and connection to the internal power installation and commissioning of the installation and user instruction – a total of 373 sets of installations.
Part 2: Supply and installation of solar collector installations for private residential buildingsPart 2: Delivery and installation of solar collector installations for private residential buildings: preparation of installation design documentation, delivery of equipment and installation elements, on-site installation of installations based on design documentation along with commissioning and instruction – a total of 151 sets of installations.
Part 3: Supply and installation of air heat pump installations for private residential buildingsPart 3: Supply and installation of air heat pump installations for private residential buildings: for the purpose of preparing domestic hot water (DHW) and for the needs of central heating (central heating) and preparation of domestic hot water (DHW): preparation of design documentation of installations, delivery of equipment and installation elements, on-site installation installations based on design documentation together with commissioning and instruction – a total of 53 sets of installations.
Part 4: Supply and installation of biomass boilers for private residential buildingsPart 4: Delivery and installation of biomass boilers for private residential buildings: preparation of installation design documentation, delivery of equipment and installation elements, on-site installation of installations based on design documentation with commissioning and instruction – a total of 30 sets. Installation.