Trockenbauarbeiten
Construction of a timber building as a two-storey solid timber building for the replacement of the existing primary and secondary school with the following services:
The following essential services are to be offered:
• Partition wall with single column mechanism, D 100 mm to 175 mm, 2 x 12.5 mm GKB,
z.T. GKBI, z.T. F30 ca. 270 m²
• Installation/partition wall with double column mechanism,
Thickness approx. 155 – 250mm approx. 125 m²
• Shaft wall with single stud, D 100 mm, 2 x 12.5 mm GKB, Q2
z.T. GKBI, z.T. F30 ca. 300 m²
• Free-standing facing shell, D 75 mm, 2 x 12.5 mm GF, Q2,
Centre distance 417 mm, Rw 20 dB approx. 1200 m²
• Facing shell with pre-wall installation room high, D 200-250 mm,
2 x 12.5 mm GKB, Q2 approx. 280 m²
• Free-standing facing shell, D 101 mm, 2x10 mm GF, Rw 20 dB
partly without sound insulation approx. 1620 m²
• Additional costs for cement construction board approx. 550 m²
• Production of window openings up to W/H 2,785/1,320 mm, in facing shell
and door openings up to W/H up to 1,190/2,150 mm, approx. 53 pieces
• Production of door openings, single stand movement approx. 23 pieces
• Working scaffolding, H up to 7.50m approx. 310 m²
• Trusses, inspection openings, recesses, etc.
• suspended ceiling, H to 1250 mm, 1 x 12.5 mm GKB (A), Q2 approx.
325 m²
• Base ceiling, self-supporting, L 520 mm, CW single profile, 2x12.5 mm GF approx. 135
m²
• Revisionsöffnungen, Deckenausschnitte, etc.