This service specification includes the services for the redesign of the planned paved areas as well as media development with electricity and water in the Kaiser-Wilhelm-Park (eastern area of the processing area) and Lenné-Park (western area of the processing area). Road construction work and work for media development (water, electricity) must be carried out for the construction of the outdoor facilities.
The following work must be carried out at a glance:
- Loosen and store 756 m³ topsoil,
- Loosen 925 m³ of soil, load, convey and put on pile,
- 500 m³ of soil, stored on site, install,
- deliver and install 50 m³ filling floor,
- 220 m
- 6 810 m
- 375 m
- clear 20 pieces of rhizome,
- 350 m
- 10 250 m
- Deliver and install 400 m³ of tree substrate, for built-up and drivable areas,
- Deliver and install 235 m³ of frost protection layer 0/32,
- Deliver and install 630 m³ gravel base course 0/32,
- 2150 m
- 6 m
- 13,300 m
- 13,300 m
- 54 m
- 36 m
- 26 m
- 60 m
- Create 55 m paving line from natural stone, 3 rows,
- 7,320 m of wooden edging to be delivered and installed,
- Delivery and installation of 126 m of concrete block edging, EF 100 x 6 x 25 cm,
- 132 m
- 132 m
- 27 m handrail for ramp system,
- 4 m
- 27 m in-situ concrete wall with an inclined top surface of 6%,
- Create 100 m³ pipe trench, depth up to 1.00 m,
- Deliver and lay 160 m heavy-duty solid wall sewer pipe DN / OD 160,
- 8 pcs. Yard gully D400 made of concrete / cast, 300 x 300 mm,
- 3 pcs. C250 drainage channel to be delivered and installed, 100 cm,
- Make 1 piece of drainage pack 100 x 100 x 100 cm,
- Create 1 190 m³ trench water pipe, T 0.70-1.00 m,
- Make 2,000 m pressure pipes, PE100, OD 63 x 5.8, SDR 11,
- 20 underground hydrant DN 50,
- Create 175 m³ of cable trench, T 0.50-0.80 m,
- 1 250 m power cable, NYY-J 5 x 6 qmm, deliver and lay,
- 1 070 m control cable, NYY-J 5 x 6 qmm, delivery and installation,
- 30 cable sleeves for cables NYY-J 5 x 6 qmm,
- Pick up 20 pcs of old town lights from the depot AG and install them,
- 2 floor recessed luminaires, can be driven over for pressure loads of up to 1,000 kg (10 kN),
- Pick up 44 pieces of bench from the depot AG and install it,
- 80 grating 500 x 1 000 mm as scratch protection, mesh 30/30 mm,
- Pick up and install 24 waste bins from the depot AG,
- 8 m tennis wall type I, playable on one side,
- 8 m safety gate, hot-dip galvanized type I, playable on one side,
- Delivery and installation of 2 bollards, diameter 76 mm,
- Create 1.3 m³ concrete foundation for the turnstile,
- 1 manual turnstile system with backstop,
- 485 m chain link fence,
- 2 gate systems for chain link fence, single-leaf, width 150 cm,
- 1 gate system for chain link fence, double-leaf, width 300 cm,
- 1 gate system for chain link fence, double-leaf, width 400 cm,
- 820 m game protection fence,
- 1 gate system for game protection fence, double-leaf, width 400 cm,
- demolish 390 m³ asphalt surfaces, breaking depth up to 15 cm,
- 525 m
- 60 m
- 280 m
- 250 m
- Demolish 1 550 m³ surface / base layers made of unbound building material mixtures,
- Break off and dispose of 2 810 m slab strips, concrete block,
- Break off and dispose of 420 m of concrete curb stones, thickness up to 8 cm,
- Break off and dispose of 26 m of natural stone paving, 1-line,
- Remove 28 pieces of cast iron / wood bench and transport it to the depot AG,
- Remove 10 pieces of concrete / wood bench and transport to the depot AG,
- Remove 16 waste bins and transport them to the depot AG,
- Remove 36 mast lights and transport them to the depot AG,
- Break off 6 metal bollards and dispose of them,
- Break off the 7 m metal handrail and dispose of it,
- Demolish and dispose of 290 m of wooden fence,
- Demolish and dispose of 297 m of metal fence,
- Remove 1 pillar and transport it to the AG depot,
- Break off and dispose of 11 street gully,
- Break off the 28 m drainage channel and dispose of it,
- Demolish and dispose of 1 metal animal enclosure,
- demolish and dispose of 1 garage,
- Break off 1 shed including the ball baffle and dispose of it.