Supply, installation and maintenance of 2 battery storage systems — 2 lots | Tenderlake

Supply, installation and maintenance of 2 battery storage systems — 2 lots

Contract Value:
EUR 303K - 963K
Notice Type:
Contract award notice
Published Date:
19 January 2016
Closing Date:
Location(s):
IT ITALIA (IT Italy/ITALIA)
Description:

The scope of the procurement is the supply, installation, maintenance and related services of 2 battery storage systems for smart grid operations, 1 in Petten (Netherlands) and 1 in Ispra (Italy). The contract includes 24 months' guarantee and up to 4 years of preventive and corrective maintenance.

Awarded to:
Supply, installation and maintenance of a battery storage system — lot 1 (Petten, Netherlands)
Freqcon GmbH, Walsrode (DE)
Supply, installation and maintenance of a battery storage system — lot 2 (Ispra, Italy)
Freqcon GmbH, Walsrode (DE)
Supply, installation and maintenance of a battery storage system — lot 1 (Petten, Netherlands)
General Impianti Srl, Maiolati Spontini AN (IT)
Supply, installation and maintenance of a battery storage system — lot 2 (Ispra, Italy)
General Impianti Srl, Maiolati Spontini AN (IT)
Download full details as .pdf
The Buyer:
European Commission, Joint Research Centre (JRC), Institute for Energy and Transport
CPV Code(s):
31230000 - Parts of electricity distribution or control apparatus
31422000 - Battery packs
31682210 - Instrumentation and control equipment
38970000 - Research, testing and scientific technical simulator
50530000 - Repair and maintenance services of machinery