Complete renovation of the school building with an extension and a new sports hall, approx. 8,500 m
- 4 units of air handling units with air capacities from 4,000 to 22,000 m
- 2 500 m
- 1 300 m ventilation duct,
- 170 volume flow controllers constant and variable,
- 55 fire dampers,
- heat pump / cold water generator 30 KW and 50 KW,
- 420 m cold pipe.