See II.2.4
The purpose of this contract is the renovation of the Wasmuël wastewater treatment plant on the territory of the Municipality of Quaregnon. The plant currently has a processing capacity of 250,000 p.e.
It concerns the renovation of the following structures:
• Entrance channel and screens, main valve, ...
• Dessableurs
The renovation mainly consists of bringing the structures back into conformity with the code on well-being at work, repairing concrete, replacing obsolete electromechanical equipment, preparing for the implementation of odor treatment.
It also involves the construction of a hangar above the existing sandblasters. This shed is necessary for the treatment of odors.
The execution of works generates significant CO2 emissions. IDEA aims to reduce these CO2 emissions when executing its public contracts. The achievement of this ambition is only possible thanks to the active efforts of its contractors. For this reason, this public contract includes the CO2 Performance Scale methodology, which rewards bidders who make efforts to reduce their CO2 emissions with an advantage under the award criteria.
The contractual provisions relating to the methodology of the CO2 performance scale are set out in points 2. Award criteria, y (performance conditions) and in article 45 penalties of these specifications.
More information on the CO2 performance scale is available on www.echelledeperformanceCO2.be
Place of execution: STEP de WASMUËL, Rue Chasse des Prés at 7390 QUAREGNON
The type of network on which the work is carried out, in accordance with B.1. is III.
The work includes, among other things:
Preparatory work
- The inventory of fixtures.
- The prior identification of the impetrants.
- Tree felling, desiccing, brush clearing.
- Demolition of roads with hydrocarbon coating.
- Changes in energy and water connections and connections.
- The excavated material of the land of rearwardness.
Modification of the entrance structure
- Implementation studies based on market guide plans
- Earthworks, shielding and water control.
- Demolitions
- Realization of civil engineering works in reinforced concrete poured in place and prefabricated.
- Concrete repairs.
- Electromechanical equipment.
- The establishment of the various pipes.
- Connections and energy connections.
Rehabilitation of the two existing sandpers
- Implementation studies based on market guide plans
- Earthworks, shielding and control of soil and wastewater.
- Demolitions
- Realization of civil engineering works in reinforced concrete poured in place.
- Concrete repairs
- Electromechanical equipment.
- The establishment of the various pipes.
- Connections and energy connections.
- The construction of a new technical room
- The construction of a shed for the treatment of odors emanating from sandblasters.
- The development of the surroundings
The development of the access and interior sidewalks to the station as well as the realization of the surroundings of the works concerned (sidewalks, fence and lawning, plantations)
Waste disposal.
Carrying out acceptance tests.
The provision of the file as built of realization.
The assembly of the IUD folder.
The work described above is not exhaustive, the details of the work are given in the technical clauses and the summary bill of quantities appended to these special specifications.
In the context of this contract, the contracting authority intends to combat social dumping and ... (see contract documents)