To develop new isotopes, IRE plans to install a qualified synthesis line for high-energy isotopes, in accordance with the standards applicable in the nuclear and pharmaceutical industry in Europe.
This contract concerns the acquisition of the following equipment:
- a line of shielded insulators composed of armoured cells and shielded prechambers;
- an armoured distribution cell and a waste management cell.
The contract includes installation and maintenance.
Armoured production cells, armoured airlocks, and waste management cellsSee point 2.1.1. of the selection guide
Armored distribution cell (dispensing), armoured airlockSee point 2.1.2. of the selection guide