Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork | Tenderlake

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 January 2023
Closing Date:
09 February 2023
Location(s):
FI1B Helsinki-Uusimaa (FI Finland/SUOMI / FINLAND)
Description:
FINAVIA CORPORATION: Paving work at Helsinki Airport in 2023

The target of the procurement is the paving work contract for Helsinki Airport in 2023.

The contractor is responsible for the execution of the paving sites indicated by the client in the area of the aforementioned contract, with all the necessary work and materials, and hands over the work to the client ready. The contractor for the paving work is responsible for the procurement of the paving aggregate.

The target of the procurement is the paving work contract for Helsinki Airport in 2023.

The contractor is responsible for the execution of the paving sites indicated by the client in the area of the aforementioned contract, with all the necessary work and materials, and hands over the work to the client ready. The contractor for the paving work is responsible for the procurement of the paving aggregate.

The contract includes the installation of the stainless steel pipe and its work in accordance with Appendix 6 Coursework for stainless steel piping work for field lights (date 30.12.2022). In addition, the contractor is obliged to carry out and provide all the documentation specified in Annex 6, as well as to follow the instructions given therein.

The contractor is obliged to carry out and submit all the documentation and tests specified in the Guide to Asphalt Pavements 2023 (30.12.2022) in Appendix 5 and to comply with the instructions given therein.

The contract will begin with milling as part of the runway 15-33 renovation contract on 3.5.2023. For scheduling reasons, the contractor is required to start work with two milling cutters, at least one of which is equipped with a machine control system whose operation is based on the surface model provided by the client. The paving work will be carried out during the 2023 season and the attached preliminary schedule in connection with the contract negotiations.

The estimated amount of asphalt is about 23,000 tonnes.

The contractor can use a stationary or movable asphalt station. The drive must be so-called. tower station. A power of at least 240 tn/h, calculated with a mixing time of 60 s, the shorter mixing time of which may not be used.