Delivery of a sewage sludge drying plant in the area of the Lindau sewage treatment plant, preparation and treatment of the sewage sludge and ongoing operation of the drying plant for a contractual period of 10 years. The annual amount of sludge is around 3,500 tons / year. The system must be designed for a maximum output of approx. 4,000 tons / year and a guaranteed drying result of> 90% - 92%. Achieve dry matter content. Contract period 1/1/2021 to 12/31/2030.
Delivery of a sewage sludge drying plant in the area of the Lindau sewage treatment plant, preparation and treatment of sewage sludge and ongoing operation of the drying plant for a contractual period of 10 years. The annual amount of sludge is around 3,500 tons. The system must be designed for a maximum output of 4,000 tons / year and achieve a guaranteed drying result of> 90% - 92%. Contract period 1.1.2021 - 31.12.2030.