Repair of 41 bogie frames (+4 optional) for light rail vehicles B.
For the running bogies of the AG's light rail vehicles B, 41 running bogie frames have to be repaired. The repair includes the steel structure executed as a welded construction - but without removable attachments. For technical and economic reasons, complete assemblies can be exchanged. Corrosion protection treatment / painting and documentation are included, as is delivery to the warehouse in Bonn-Dransdorf. The complete documentation and all evidence relevant for commissioning must be delivered. All work must be coordinated and carried out closely with the technical supervisory authority.