Construction project: renovation of the primary and secondary school Tann, Gewerk: tiling
- approx. 1,250 m² surface primer
- approx. 700 m² of surface leveling in the wall area
- approx. 550 m² of surface leveling in the ground area
- approx. 280 m² composite seal on wall/floor surfaces
- approx. 700 m² wall tiles toilet area grey
- approx. 100 m² wall tiles toilet area colored
- approx. 280 pieces allowance for making holes
- approx. 270 m² flooring entrance area
- approx. 155 m plinth tiles
- approx. 280 m² floor tiles toilet area
- approx. 100 m steps stair run
- approx. 30 m² steps stair landing
- approx. 100 m risers stair run