Description:
Clean energy - clean environment, renewable energy sources for individual farms from the municipality of Węgierska Górka

The subject of the contract is the delivery and assembly of:

1) photovoltaic installations used to supply buildings with electricity on residential buildings in the Municipality of Węgierska Górka;

2) installation of a pellet boiler used to supply buildings with thermal energy for the purpose of heating the building and heating domestic hot water on residential buildings in the Municipality of Węgierska Górka;

3) installation of heat pumps for CO and DHW used to supply buildings with thermal energy for the purpose of heating the building and heating domestic hot water on residential buildings in the Municipality of Węgierska Górka;

4) installation of DHW heat pumps used to supply buildings with thermal energy for the purpose of heating domestic hot water on residential buildings in the Municipality of Węgierska Górka;

5) solar installations used to supply buildings with thermal energy for the purpose of heating domestic hot water on residential buildings in the Municipality of Węgierska Górka.

Supply and assembly of solar installations

1. The subject of the contract is the supply and installation of photovoltaic installations used to supply buildings with electricity on residential buildings in the Municipality of Węgierska Górka, as part of the project entitled: "Clean energy - clean environment, renewable energy sources for individual farms from the area of the Municipality of Węgierska Górka and the Municipality of Wisła", co-financed under the Regional Operational Program of the Silesian Voivodeship for the years 2014-2020 (European Regional Development Fund) for the axis priority: IV. Corrective actions in the context of the COVID-19 pandemic - REACT-EU for action: 14.3. Renewable energy sources – REACT-EU.

2. As part of part of the contract No. 1, the Contractor will be obliged to:

1) preparation of design and as-built documentation by authorized persons;

2) delivery of equipment in accordance with the design documentation;

3) installation of the photovoltaic panel system along with the supply of instrumentation and wiring and grounding;

4) connection of the photovoltaic installation to the internal network of buildings and reconstruction of the energy measurement system adapting the system to measure energy generated from RES together with the notification of micro-installations to the grid;

5) configuration of the monitoring system application;

6) perform appropriate tests and measurements and draw up protocols;

7) acceptance of works.

3. Details of the scope of the subject of this contract specify - for part of the contract No. 1 - specifies Annex No. 8a to swz - Description of the Subject of the Contract - for part of the contract No. 1, and the requirements for the execution of the contract Annex 9 to the SWZ - Draft contract.

4. The Contractor is also obliged to prepare the necessary documents for each user to connect the installation to the power, water and sewage network or CO and DHW and make a notification on behalf of each user to the appropriate energy company (if applicable).

5. The Contractor is responsible for the installation and connection through an authorized installer who will guarantee the correct performance of the order, including the installation and operation of the installation while meeting the operational safety of the installation and cooperation with the power grid of the appropriate distributor, water and sewage or CO and DHW.

6. The Contractor shall, in order, perform the marking of the installation with information plates, regarding the source of financing for the investment. The delivery of the plates belongs to the Ordering Party.

7. The Contractor is obliged to agree in advance at least a week with the Contracting Authority and the owners of the individual property the date of commencement of work and the arrangement of the equipment on each property, respectively. The organisation of the work must take into account the specifics of the object and the resulting The work should be arranged so that the nuisance of the work carried out is the least and provides security for the residents of the property.

8. Supplied and fitted installations and equipment referred to in paragraph 1 shall be the property of the Contracting Authority.

Due to the limited number of characters that can be entered into the content of the advertisement, the remaining information is included in the SWZ.

Delivery and installation of pellet boiler installation

1. The subject of the contract is the supply and installation of pellet boiler installations used to supply buildings with thermal energy for the purpose of heating the building and heating domestic hot water on residential buildings in the Municipality of Węgierska Górka, as part of the project entitled: "Clean energy - clean environment, renewable energy sources for individual farms from the municipality of Węgierska Górka and the Municipality of Wisła", co-financed under the Regional Operational Program of the Silesian Voivodeship for 2014-2020 (European Regional Development Fund) for priority axis IV. Corrective actions in the context of the COVID-19 pandemic - REACT-EU for action: 14.3. Renewable energy sources – REACT-EU.

2. As part of part of the contract No. 2, the Contractor will be obliged to:

1) preparation of design and as-built documentation by authorized persons;

2) delivery of equipment in accordance with the design documentation;

3) installation of a pellet boiler with the delivery and assembly of tooling and piping;

4) connecting the pellet boiler installation to the existing CO and DHW installation of the building;

5) configuration of the monitoring system application;

6) perform appropriate tests and measurements and draw up protocols;

7) acceptance of works.

3. Details of the scope of the subject of this contract specify - for part of the contract No. 2 - specifies Annex No. 8b to the SWZ - Description of the Subject of the Contract - for part of the contract No. 2, and the requirements for the execution of the contract Annex No. 9 to the SWZ - Draft Contract;

4. The Contractor is also obliged to prepare the necessary documents for each user to connect the installation to the power, water and sewage network or CO and DHW and make a notification on behalf of each user to the appropriate energy company (if applicable).

5. The Contractor is responsible for the installation and connection through an authorized installer who will guarantee the correct performance of the order, including the installation and operation of the installation while meeting the operational safety of the installation and cooperation with the power grid of the appropriate distributor, water and sewage or CO and DHW.

6. The Contractor shall, in order, perform the marking of the installation with information plates, regarding the source of financing for the investment. The delivery of the plates belongs to the Ordering Party.

7. The Contractor is obliged to agree in advance at least a week with the Contracting Authority and the owners of the individual property the date of commencement of work and the arrangement of the equipment on each property, respectively. The organisation of the work must take into account the specifics of the object and the resulting The work should be arranged so that the nuisance of the work carried out is the least and provides security for the residents of the property.

8. Supplied and fitted installations and equipment referred to in paragraph 1 shall be the property of the Contracting Authority.

Due to the limited number of characters that can be entered into the content of the advertisement, the remaining information is included in the SWZ.

Delivery and installation of heat pump installations for CO and DHW (ground and air pumps)

1. The subject of the contract is the supply and installation of heat pump installations for CO and DHW used to supply buildings with thermal energy for the purpose of heating the building and heating domestic hot water on residential buildings in the Municipality of Węgierska Górka, as part of the project entitled: "Clean energy - clean environment, renewable energy sources for individual farms from the municipality of Węgierska Górka and the Municipality of Wisła", co-financed under the Regional Operational Programme of the Silesian Voivodeship for the years 2014-2020 (European Regional Development Fund) for the priority axis: IV. Corrective actions in the context of the COVID-19 pandemic - REACT-EU for action: 14.3. Renewable energy sources – REACT-EU.

2. As part of part of the contract No. 3, the Contractor will be obliged to:

1) preparation of design and as-built documentation by authorized persons;

2) delivery of equipment in accordance with the design documentation;

3) installation of the heat pump system for CO and DHW (ground and air pumps) along with the delivery and installation of solar instrumentation and piping;

4) connection of the heat pump installation to the CO and DHW network of buildings;

5) configuration of the monitoring system application;

6) perform appropriate tests and measurements and draw up protocols;

7) acceptance of works.

3. Details of the scope of the subject of this contract specify - for part of the contract No. 3 - specifies Annex No. 8c to the SWZ - Description of the Subject of the Contract - for part of the contract No. 3, and the requirements for the performance of the contract Annex No. 9 to the SWZ - Draft contract.

4. The Contractor is also obliged to prepare the necessary documents for each user to connect the installation to the power, water and sewage network or CO and DHW and make a notification on behalf of each user to the appropriate energy company (if applicable).

5. The Contractor is responsible for the installation and connection through an authorized installer who will guarantee the correct performance of the order, including the installation and operation of the installation while meeting the operational safety of the installation and cooperation with the power grid of the appropriate distributor, water and sewage or CO and DHW.

6. The Contractor shall, in order, perform the marking of the installation with information plates, regarding the source of financing for the investment. The delivery of the plates belongs to the Ordering Party.

7. The Contractor is obliged to agree in advance at least a week with the Contracting Authority and the owners of the individual property the date of commencement of work and the arrangement of the equipment on each property, respectively. The organisation of the work must take into account the specifics of the object and the resulting The work should be arranged so that the nuisance of the work carried out is the least and provides security for the residents of the property.

8. Supplied and fitted installations and equipment referred to in paragraph 1 shall be the property of the Contracting Authority.

Due to the limited number of characters that can be entered into the content of the advertisement, the remaining information is included in the SWZ.

Delivery and installation of heat pump installations for DHW

1. The subject of the contract is the supply and installation of heat pump installations for DHW used to supply buildings with thermal energy for the purpose of heating domestic hot water on residential buildings in the Municipality of Węgierska Górka, as part of the project entitled: "Clean energy - clean environment, renewable energy sources for individual farms from the municipality of Węgierska Górka and the Municipality of Wisła", co-financed under the Regional Operational Program of the Silesian Voivodeship for the years 2014-2020 (European Regional Development Fund) for priority axis: IV. Corrective actions in the context of the COVID-19 pandemic - REACT-EU for action: 14.3. Renewable energy sources – REACT-EU.

2. As part of part of the contract No. 4, the Contractor will be obliged to:

1) preparation of design and as-built documentation by authorized persons;

2) delivery of equipment in accordance with the design documentation;

3) installation of a heat pump system for DHW along with the delivery and installation of solar instrumentation and piping;

4) connecting the heat pump installation to the DHW network of buildings: connecting the upper coil to the current heat source and the lower coil to the existing water supply network in the building;

5) configuration of the monitoring system application;

6) perform appropriate tests and measurements and draw up protocols;

7) acceptance of works.

3. Details of the scope of the subject of this contract specify - for part of the contract No. 4 - specifies Annex No. 8d to the SWZ - Description of the Subject of the Contract - for part of the contract No. 4, and the requirements for the execution of the contract Annex No. 9 to the SWZ - Draft contract.

4. The Contractor is also obliged to prepare the necessary documents for each user to connect the installation to the power, water and sewage network or CO and DHW and make a notification on behalf of each user to the appropriate energy company (if applicable).

5. The Contractor is responsible for the installation and connection through an authorized installer who will guarantee the correct performance of the order, including the installation and operation of the installation while meeting the operational safety of the installation and cooperation with the power grid of the appropriate distributor, water and sewage or CO and DHW.

6. The Contractor shall, in order, perform the marking of the installation with information plates, regarding the source of financing for the investment. The delivery of the plates belongs to the Ordering Party.

7. The Contractor is obliged to agree in advance at least a week with the Contracting Authority and the owners of the individual property the date of commencement of work and the arrangement of the equipment on each property, respectively. The organisation of the work must take into account the specifics of the object and the resulting The work should be arranged so that the nuisance of the work carried out is the least and provides security for the residents of the property.

8. Supplied and fitted installations and equipment referred to in paragraph 1 shall be the property of the Contracting Authority.

Due to the limited number of characters that can be entered into the content of the advertisement, the remaining information is included in the SWZ.

Delivery and installation of solar installations

1. The subject of the contract is the supply and installation of solar installations used to supply buildings with thermal energy for the purpose of heating domestic hot water on residential buildings in the Municipality of Węgierska Górka, as part of the project entitled: "Clean energy-clean environment, renewable energy sources for individual farms from the area of the Municipality of Węgierska Górka and the Municipality of Wisła", co-financed under the Regional Operational Program of the Silesian Voivodeship for the years 2014-2020 (European Regional Development Fund) for priority axis: IV. Corrective actions in the context of the COVID-19 pandemic - REACT-EU for action: 14.3. Renewable energy sources – REACT-EU.

2. As part of part of the contract No. 5, the Contractor will be obliged to:

1) preparation of design and as-built documentation by authorized persons;

2) delivery of equipment in accordance with the design documentation;

3) installation of the solar system together with the delivery and installation of solar instrumentation and piping;

4) connecting the solar installation to the DHW network of buildings: connecting the upper coil to the current heat source and the lower coil to the existing water supply network in the building;

5) perform appropriate tests and measurements and draw up protocols;

6) acceptance of works.

3. Details of the scope of the subject of this contract specify - for part of the contract No. 5 - specifies Annex No. 8e to the SWZ - Description of the Subject of the Contract - for part of the contract No. 5, and the requirements for the execution of the contract Annex No. 9 to the SWZ - Draft contract.

4. The Contractor is also obliged to prepare the necessary documents for each user to connect the installation to the power, water and sewage network or CO and DHW and make a notification on behalf of each user to the appropriate energy company (if applicable).

5. The Contractor is responsible for the installation and connection through an authorized installer who will guarantee the correct performance of the order, including the installation and operation of the installation while meeting the operational safety of the installation and cooperation with the power grid of the appropriate distributor, water and sewage or CO and DHW.

6. The Contractor shall, in order, perform the marking of the installation with information plates, regarding the source of financing for the investment. The delivery of the plates belongs to the Ordering Party.

7. The Contractor is obliged to agree in advance at least a week with the Contracting Authority and the owners of the individual property the date of commencement of work and the arrangement of the equipment on each property, respectively. The organisation of the work must take into account the specifics of the object and the resulting The work should be arranged so that the nuisance of the work carried out is the least and provides security for the residents of the property.

8. Supplied and fitted installations and equipment referred to in paragraph 1 shall be the property of the Contracting Authority.

Due to the limited number of characters that can be entered into the content of the advertisement, the remaining information is included in the SWZ.

Download full details as .pdf
The Buyer:
Gmina Węgierska Górka
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy
09331100 - Solar collectors for heat production
09331200 - Solar photovoltaic modules
42511000 - Heat-exchange units and machinery for liquefying air or other gases
42511110 - Heat pumps
45111200 - Site preparation and clearance work
45300000 - Building installation work
45310000 - Electrical installation work
45311200 - Electrical fitting work
45315300 - Electricity supply installations
45317300 - Electrical installation work of electrical distribution apparatus
45321000 - Thermal insulation work
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45331100 - Central-heating installation work
45331110 - Boiler installation work
45332200 - Water plumbing work