The Port of Kalundborg wishes to purchase two new shore power plants with associated equipment for the Port of Kalundborg's East Harbour for connecting ships, which are often in port for longer periods of time. The agreement concerns only the supply and installation of the onshore power installations themselves, since civil engineering and leasing contracts are separated into separate contracts and thus not covered by this invitation to tender.
The Port of Kalundborg wishes to purchase two new shore power plants with associated equipment for the Port of Kalundborg's East Harbour for connecting ships, which are often in port for longer periods of time. Specifically, it is planned to set up two containers/technical modules, each of which can be connected to one to two ships at a time, so that a total of 3 ships can be connected to shore power simultaneously. This invitation to tender concerns a contract for the supply and installation of two technical modules (containers), each of which has two connecting pins at quays 4,5,7 and 9 respectively. Each connecting splinter must be equipped with outlets where it is possible to access 400V/690V, 50Hz/60Hz at up to 400A. The agreement thus means that the tenderer must supply, install, connect and commission two technical modules for shore power and four connection plinths with 400A outlets on the quay at the Port of Kalundborg and deliver all other equipment, equipment and components, as prescribed in the requirements specification, cf. Appendix 1, and all other equipment, equipment and components to put these plants into complete operation according to the purpose in complete and completed condition.