General renovation of the monastery forge and the municipal brewery and replacement building of the monastery mill.
- Demolition / earthworks: lawns take off 500 m
- Drainage: drains 14 pieces, box gutter 10 m,
- Steps, foundations, L-stones: granite block steps 26 m, individual foundations 15 pieces, L-stones 17 m,
- water basin + technology: granite stone channel 16 m,
- Base layers: Schroppen 50 m
- Edges, coverings: shelves made of granite stone 217 m, lines made of granite stone 235 m, steel edges 37 m etc.,
- Equipment: chain link fence with 55 m post,
- Vegetation technology Work: deliver and install topsoil 200 m³, lawns 400 m