Heating, ventilation and sanitary facilities 2. BA.
Sanitary facilities:
- 148 m underground sewer DN 100-150;
- 65 m
- 140 m plastic waste water pipe DN 40-100;
- 45 st decentralized ventilation devices with heat recovery;
- 6 wash basins;
- 3 shower units;
- 6 toilet facilities;
- 500 m stainless steel pipe DN 12-50;
- 230 m MVB pipe DN 12-20.
Heating systems:
- Winter construction heat supply with 4 air heaters, PWW;
- 650 m heating cable made of seamless steel tube;
- 120 m
- 35 panel radiators;
- 5 steel tubular radiators;
Ventilation and refrigeration systems:
- 1 supply and exhaust air unit for wall mounting approx. 240 m
- 1 pc supply and exhaust air device for ceiling mounting approx. 500 m
- 9 pc toilet exhaust fans 60-100 m
- 80 m air line from spiral duct DN 80-200;
- 1 pc inverter multi-split outdoor unit;
- 1 pc inverter mono split outdoor unit;
- 3 pieces of inverter wall units.
Fire extinguishing systems:
- 1 piece of extinguishing water supply device;
- 4 pc fire water closet;
- 22 m stainless steel pipe DN 50 and 80 as a fire water pipe.