Gardening and landscaping work
demolition work of coverings in small areas,
Erdaushubarbeiten 250m³,
Topsoil and substrate work 280m³,
Water pipes, electrical and canal ditches 210m,
Entwässerungsleitungen 200m,
Frischwasserrohre 450m,
Making container connections 28pcs.,
Kabelschutzrohre 80m,
Precast concrete elements 50pcs.,
Köcherfundamente 100St.,
Schraubfundamente 70 St.,
min. Tragschichten 150m³,
Wooden surrounds 450m,
Paving work in small areas and adjustments
water-bound top layer 2.200m²,
Connection cable with plug CEE 32A 700m,
Mount benches 35pcs.,
Flagpoles made of wood provide 100pcs.,
various bicycle racks, locker systems, dog boxes, etc. mount
various constructions made of wood