B33n road construction AS Allensbach-Ost - AS Hegne-West.
- Removal of topsoil approx. 26,000 m
- Earth excavation approx. 112 000 m
- Soil improvement approx. 60,000 m
- poured. Soil improve approx. 87 000 m
- Steel sheet piling approx. 3 500 m
- Trench and excavation of excavation pit approx. 17 000 m
- vertical drains approx. 147,000 m;
- plastic pipes / seepage lines approx. 5 300 m;
- reinforced concrete pipes approx. 1 110 m;
- precast concrete / plastic shafts approx. 110 units;
- Canal construction in a closed construction approx. 600 m;
- Cable trenches / plows approx. 4,000 m;
- cable protection tubes approx. 9 275 m;
- slot channels approx. 800 m;
- concrete guide elements approx. 630 m;
- Milling asphalt approx. 32,000 m
- Asphalt foundation layer approx. 18 200 m
- Frost protection layer approx. 11 300 m
- AC 32 asphalt base courses approx. 29,000 m
- Asphalt binder courses AC BS SG approx. 23,000 m
- SMA / AC 11 D asphalt surface courses approx. 29,000 m
- Asphalt base course AC 16 TD approx. 12,000 m