Lamps and light fittings | Tenderlake

Lamps and light fittings

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 January 2022
Closing Date:
04 February 2022
Location(s):
PL815 Puławski (PL Poland/POLSKA)
Description:
Construction and modernization of street lighting in the territory of the Nałęczów Municipality

1) the implementation of the executive project and the agreement with the local Operator of the Distribution System — PGE Distribution SA District Puławy, prior to the start of installation and the conclusion of an agreement with the OSD on cooperation in the modernization of road and street lighting,

2) dismantling 1 267 pcs of existing fixtures,

3) delivery of LED street lighting fixtures, in accordance with the submitted offer, in place of conducting installation work in the amount of 1 382 pcs. (modernization of existing fixtures

1 267 pcs + construction of 115 luminaires), having variable power profile functionality and individual change of power profile and monitoring the status of luminaires. The level of programming of the 24 h cycle power supply supplied luminaire should take into account both the requirements of the standard of street lighting PN-EN 13201:2016 or the equivalent reference system as well as the requirements set out in the Regulation of the Minister of Economy of 4 May 2007 on detailed conditions operation of the electricity system (Journal of Laws no 93/2007, item .623)

1) the implementation of the executive project and the agreement with the local Operator of the Distribution System — PGE Distribution SA District Puławy, prior to the start of installation and the conclusion of an agreement with the OSD on cooperation in the modernization of road and street lighting,

2) dismantling 1 267 pcs of existing fixtures,

3) delivery of LED street lighting fixtures, in accordance with the submitted offer, in place of conducting installation work in the amount of 1 382 pcs. (modernization of existing fixtures

1 267 pcs + construction of 115 luminaires), having variable power profile functionality and individual change of power profile and monitoring the status of luminaires. The level of programming of the 24 h cycle power supply supplied luminaire should take into account both the requirements of street lighting standard PN-EN 13201:2016 or the equivalent reference system as well as the requirements set out in the Regulation of the Minister of Economy dated

4 May 2007, on the detailed conditions for the operation of the electricity system (Journal of Laws No 93/2007, item .623, as amended),

4) installation of supplied outdoor lighting fixtures on booms and poles according to “Description of requirements for performance and functionality Modernization of street lighting in Nałęczów Municipality” (tables), in the amount of 1 382 pcs. ,

5) when installing fixtures, if the light of the light point is limited by tree branches, the obstacle should be removed by trimming.

6) Installation of power cables (luminaire - protection) with a length of approx. 4 m per set for overhead line poles and approx. 12 m per set for cable line poles,

7) installation of security for all luminaires: 4A fused insert,

8) Installation of overhead fuses in the amount of 450 pcs and insulated cable connectors in the amount of 817 sets.

9) replacement of AL/Cu current terminals for all luminaires on overhead lines (450 pcs.). At the connector on the non-insulated line, use a clamp adapted for mounting on non-insulated lines, at the connector on the insulated line, the clamp adapted for mounting on the insulated line,

10) delivery and installation of 79 pieces of lighting cabinets equipped with control clocks, overvoltage protection B+C, “soft start” system and with the elevation of measurement systems outside the area of transformer stations together with the execution of the required projects, the elevation of 20 pieces of cabinets outside transformer station area.

11) delivery and installation of 79 pcs of reactive power compensation systems,

12) replacement of the booms with galvanized single-arm units for upgraded luminaires on overhead lines with geometric parameters resulting from photometric calculations fixed above the line and, in justified cases, where mounting above the line is impossible, under the supply line - in quantities 331 pcs. ,

13) Construction of road lighting poles in the amount of 115 pcs., the total length of the cable line

4 574 m, number of built lighting cabinets 3 pcs. :

a) Sadurki DP 2542L, cable line length 1379 m, 36 pcs. Aluminum poles height 10m with boom 1,5m, set on a prefabricated foundation, 1 piece lighting cabinet,

b) Trees Colony DP 2543L, cable line length 2258 m, 55 pcs. Aluminum poles height 10m with boom 1.5m, set on a prefabricated foundation, 1 piece lighting cabinet,

c) Piotrowice DP 2539L, cable line length 805 m, 21 pcs. Aluminum poles height 10m with boom 1.5m, set on a prefabricated foundation, 1 piece lighting cabinet,

d) Piotrowice DG, cable line length 132 m, 3 pcs. Aluminum poles height 10m with a boom of 1.5m, built on a prefabricated foundation.

14) equipment and commissioning of the lighting control and monitoring system,

15) making measurements of the effectiveness of anti-shock protection,

16) Measurement of grounding resistance and insulation of wires and cables

17) making measurements of the intensity of illumination for five sections of modernized lighting indicated by the Ordering Party,

18) execution of installed power measurements and cos φ for wsz

Download full details as .pdf
The Buyer:
GMINA NAŁĘCZÓW
CPV Code(s):
31520000 - Lamps and light fittings
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45316110 - Installation of road lighting equipment
71355200 - Ordnance surveying