Framework provider (TU) for the planning, construction and management of fast charging stations SLS
The user is the cantonal police SG, which will equip the mobile emergency groups with powerful electric cars in a first phase in 2021/22. These must be able to be recharged in a short time at the 4 police bases and 2 locations. To ensure the operational capability of 24h/365T. In the future, the existing vehicle fleet (combustion engines) will also be replaced by electric cars.
Since the exact location within the sites, as well as the need for the service level at the time of the tender, has not yet been definitively determined, a framework agreement is concluded. This will regulate the framework conditions for cooperation. In the event of a specific need for services, the corresponding services are called up on the basis of the framework agreement. A certain order volume cannot be guaranteed.
Framework provider (TU) for the planning, construction and management of fast charging stations SLS
The user is the cantonal police SG, which will equip the mobile emergency groups with powerful electric cars in a first phase in 2021/22. These must be able to be recharged in a short time at the 4 police bases and 2 locations. To ensure the operational capability of 24h/365T. In the future, the existing vehicle fleet (combustion engines) will also be replaced by electric cars.
Since the exact location within the sites, as well as the need for the service level at the time of the tender, has not yet been definitively determined, a framework agreement is concluded. This will regulate the framework conditions for cooperation. In the event of a specific need for services, the corresponding services are called up on the basis of the framework agreement. A certain order volume cannot be guaranteed.