Complete chemical handling of the process of generating electricity and heat in Enea Elektrownia Połaniec S.A.
SWZ III numbering
1.2. The scope of services includes:
1.2.1. operational and laboratory services, including:
1.2.1.1. control and correction of the chemical parameters of water and steam circuits of energy blocks together with the operation and supervision of technological systems dedicated for this purpose;
1.2.1.2. control of the chemical parameters of water circuits of the district heating stations of member No 1 and No 2 (abbreviated: CC1 and CC2) and correction of the water circulation of the district heating station of member No 2;
1.2.1.3. control of the purity of gases in the generators and tanks of the hydrogen storage station;
1.2.1.4. control of the quality of the transformation of limestone and the chemical parameters of the media related to the operation of the exhaust gas desulphurization plant in wet technology;
1.2.1.5. quality control of conventional fuels in supply and consumption;
1.2.1.6. qualitative control of biomass, forestry and off-the-shelf fuel in consumption;
1.2.1.7. quality control of additives (sand, kaolinite, limestone, hydrated lime) in supply;
1.2.1.8. control of the concentration of chemicals for technological installations (ammonia water, organic acid, hydrochloric acid, sodium hydroxide, sodium hypochlorite);
1.2.1.9. chemical control of firebox wastes/by-products and deposits from dust boilers and fluidized boiler;
1.2.1.10. chemical control of water treatment technology for process, social and residence purposes and protection purposes. ;
1.2.1.11. chemical control of surface water and wastewater;
1.2.1.12. control of glycol parameters from the heating system K9;
1.2.1.13. chemical control of the sediment from the stormwater treatment plant from the backend area;
1.2.2. supervision and control services for the maintenance and maintenance of technological systems applied by the Contracting Authority;
1.2.3. preparation of reagents for automatic control and measurement apparatus;
1.2.4. auxiliary chemical services in the implementation of specialized analyses commissioned by the Ordering Party in external research units;
1.2.5. consultancy and chemical handling in the performance of tests on the Contracting Authority's technological installations to the extent determined by the performance programmes of these tests;
1.2.6. keeping records and records of the results of the tests and analyses carried out in the manner required by the Contracting Authority;
1.2.7. issuing malfunction notices on technological systems and control and measurement apparatus in the area of operation assigned to the Contractor using the PM module WCM of the SAP system.