Facade work | Tenderlake

Facade work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
07 September 2020
Closing Date:
06 October 2020
Location(s):
DE126 Mannheim, Stadtkreis (DE Germany/DEUTSCHLAND)
Description:
NTM - Conversion of the trial center Neckarau PZN

Aluminum curtain wall.

Aluminum curtain wall made of ALU panels 725/3 000 mm, partially perforated:

Approx. 335 m 2 . Substructure made of Omega profiles, connected with on-site steel girder construction: approx. 285 running meters. Corner formations, base plates, block frame door flush with the wall.

Download full details as .pdf
The Buyer:
Stadt Mannheim – Fachbereich Baurecht.Bauverwaltung.Denkmalschutz.
CPV Code(s):
45443000 - Facade work