Electric power supply for the year 2022 (and possible 2023) at the demand points managed by Acuamed.
High voltage supply. Supply points with rates in six periods, according to RD 1164/2001 (rates 6.X)High voltage supply. Supply points with rates in six periods, according to RD 1164/2001 (rates 6.X).
Low voltage supply. Supply points with rates with two and three periods, according to RD 1164/2001 (rest of supply points)Low voltage supply. Supply points with rates with two and three periods, according to RD 1164/2001 (rest of supply points).