Engineering design services for the construction of civil engineering works | Tenderlake

Engineering design services for the construction of civil engineering works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 June 2023
Closing Date:
03 July 2023
Location(s):
PL841 Białostocki (PL Poland/POLSKA)
Description:
Development of design documentation for: Construction of a pedestrian and bicycle road along the county road No. 1550B on the section Klepacze - Niewodnica Kościelna (Choroszcz Commune, Turośń Kościelna Commune) - Stage I

The subject of the contract is: Development of design documentation for: Construction of a pedestrian and bicycle road along the county road No. 1550B on the section Klepacze - Niewodnica Kościelna (Choroszcz commune, Turośń Kościelna commune) - Stage I in the Turośń Kościelna commune

A detailed description of the contract is provided in Chapter III of this SWZ.

1. 1. Existing state (cadastral data subject to verification by the Designer)

1.1. Width of the existing roadway and crown

The length of the section – about 0.55km.

The beginning of the section - on the border with the Choroszcz commune. The end of the section in km rob. approx. 0+550 at the intersection with the county road No. 1543B in the town of Niewodnica Kościelna, Turośń Kościelna commune.

Bituminous road with a roadway width of 6.0m; street cross-section, trail; roadside width 1.0m. Road lane width: about 11m-54m.

1.2.Engineering objects

Minimum two culverts under the crown of the road – provide for reconstruction/extension or construction of new culverts under the designed road for pedestrians and bicycles

1.3.External equipment (according to publicly available geodetic resources):

- power grid (overhead and ground), including MV,

- telecommunications network,

- water supply network,

-gas pipeline

- storm water drainage network,

2. OUTPUT FOR DESIGN

2.1 Road class: standard Z.

2.2 A design of a pedestrian and bicycle path with a width consistent with the technical conditions should be developed. Preferred location: in the building area behind the curb, outside the building area on a separate body; left side

2.3 Construction: surface – asphalt concrete in two layers (3cm + 3cm) on an aggregate foundation.

2.4 One exit to one plot should be designed at the location agreed with the property owner.

2.5 Design a system that provides an effective way of draining the road lane.

2.6 Construction/reconstruction of trenches.

2.7 Construction/reconstruction of culverts under the crown of the road and under the exits.

2.8 Installation of protective barriers over culverts and in places requiring their location

2.9 Proposals for planting trees

Provide for felling and grubbing-up of all trees that threaten safety or interfere with road reconstruction.

Provide for the removal of unnecessary bushing and all taverns.

On the land development plan, number all trees and bush areas intended for felling. A list of trees and shrubs to be felled in tabular form should be attached, including: two-part names, tree diameters/circumference, bush area and geodetic number of the parcel.

2.10 Proposals for the reconstruction (security) of associated equipment

Reconstruction of external equipment (existing and designed) should be envisaged in terms of removing collisions with the proposed solutions in the event of their occurrence. For this purpose, the Contractor shall provide authors of projects of individual industries with appropriate authorizations allowing the development of project documentation of a given industry.

The scope of transmission of external devices should be agreed with the Ordering Party. Costs should be minimised as far as possible. Industry projects must be absolutely agreed with the network administrators.

In the area covered by the investment, infrastructure is located, in accordance with publicly available geodetic resources:

- power grid (overhead and ground), including MV,

- telecommunications network,

- water supply network,

-gas pipeline

- storm water drainage network,

The Contracting Authority does not exclude the presence of other technical infrastructure than the one mentioned above. In the event of a collision with other devices/technical infrastructure, the Contractor of the design documentation is obliged to develop, as part of this contract, industry executive designs to the extent necessary to develop a complete construction project.

The Contractor's responsibility for the design documentation is to obtain technical conditions from network operators for collision removal/protection of existing technical infrastructure / devices.

3. SCOPE OF THE STUDY

3.1. Develop all the necessary materials and obtain all arrangements for a building permit. The cost of arrangements (including fees for water permits) is borne by the contractor of the project documentation. The contracting authority provides for obtaining consent for the implementation of a road investment under the "Special Road Act".

Download full details as .pdf
The Buyer:
Powiat Białostocki - Powiatowy Zarząd Dróg w Białymstoku
CPV Code(s):
71322000 - Engineering design services for the construction of civil engineering works