New construction of the Vitelliusbad Wittlich
here: Rock panel curtain wall
Hallenbadbereich:
1 Psch Technical Processing
10 hrs Pattern large format
4,32 to Stahlunterkonstruktionen
755 m² façade cladding
755 m² aluminium substructure for curtain walls
755 m² MW insulation; d= 180mm
113m² allowance XPS insulation; d= up to 180mm
38 m² ALLOWANCE Window cladding perforated sheet metal
38 m² ALLOWANCE PU coating of clothing
1,00 Psch SUPPLEMENT Training Connection to large slide, diameter slide approx. 1,2m
2 pcs. ALLOWANCE Weather protection grille
52 m² ALLOWANCE Reveal sheet metal formation
34 m ALLOWANCE Ventilation plate lintel area; ABW: 350mm
50 m² SUPPLEMENT extra / reduced price panels< 5,00m
25 m² ALLOWANCE Inclined wall surface for reveals
50 m² ALLOWANCE Inclined ceiling
10 m ALLOWANCE Window sill, ABW: approx. 440mm
34 m ALLOWANCE Base termination, ABW: approx. 450mm
170 m ALLOWANCE upper façade end; Attica
98 m ALLOWANCE Outer edges with edge varnish
15 pcs. ALLOWANCE Facade penetrations (round)
15 pcs. ALLOWANCE Facade penetrations (angular)
59 m ALLOWANCE Bevel cuts
20 pcs SUPPLEMENT for relining
1 Psch preparations UK for advertising system
Make 20 cut-outs, d= 20-30mm
Freibadbereich:
1 Psch Technical Processing
141 m² façade cladding - riveted to ALU-UK
141 m² aluminium substructure for curtain wall
141 m² MW insulation, d = 80 mm
11 m² ALLOWANCES XPS insulation; d= up to 80mm
27 m² ALLOWANCE Facade cladding Soffit Roof overhang
3.15 m² ALLOWANCE Reveal training
17 m allowance for base termination, ABW = approx. 450mm
64 m allowance for upper façade finish, attic
60 m allowance outer corners with edge varnish
14 pcs allowance for façade penetrations round
13 pcs allowance for rectangular cutouts
10 pcs allowance for relining