Construction of flood protection walls on deep foundations
Hydraulic engineering, engineering structures, special civil engineering, traffic route construction, pipeline construction, earthworks, demolition - construction of flood protection wall (reinforced concrete) on bored pile foundation including associated hydraulic engineering work and land-side drainage and adaptation work
about 2 000 m
Approx. 340 m bored piles, D = 1.2 m, unreinforced
approx. 1 240 m bored piles, D = 1.2 m, reinforced
Approx. 2 160 m bored piles, D = 1.0 m, reinforced
Approx. 160 m building underpinning, up to 3.0 m, HDI process
about 550 m
about 650 m
approx. 495 m fillet railing according to RIZ-Ing.
about 8 000 m
1 x StB shaft DN 400 and DN 600 each
Approximately 500 m channels, nominal diameters DN 150 - DN 300
Platz-, Wege- and Hofbefestigungen different construction methods on land side including surface drainage