Structural work and civil engineering for the new construction of an office building on the outskirts of Darmstadt's city center with 5 full floors and a partial basement, without underground parking.
- LEED platinum certification;
- Flat, not cramped, easily accessible property;
- BRI above ground approx. 36 740 m
- GFA above ground approx. 9 500 m
- building length approx. 112 m; Building width 9.50-26.70 m.
- Structural and civil engineering work for the new construction of an office building on the edge of Darmstadt's city center with 5 full floors and a partial basement, without underground parking. LEED platinum certification;
- Flat, not cramped, easily accessible property;
- BRI above ground approx. 36 740 m
- GFA above ground approx. 9 500 m
- building length approx. 112 m; Building width 9.50-26.70 m;
- construction site equipment;
- basement as a white tub construction,
- Berlin shoring, among other things, to protect existing pipeline routes (gas, district heating, data) approx. 350 m
- Excavation pit approx. 12,000 m
- reinforced concrete skeleton structure;
- 2 reinforced concrete fire walls;
- ceilings as flat ceilings; Beams in partial areas;
- 3 massive development cores;
- Special requirements for exposed concrete surfaces of ceilings and walls, including 1-axis curved wall surfaces on all floors;
- In-situ concrete structures, flights of stairs as prefabricated parts;
- STB base plate in waterproof design approx. 1,700 m
- Insulation under the floor slab approx. 1,700 m
- Perimeter insulation basement walls approx. 710 m
- STB outer walls in waterproof design approx. 710 m
- STB outer walls approx. 215 m
- STB interior walls approx. 4 860 m
- STB ceiling panels, d = 30 cm, approx. 8 820 m
- STB supports approx. 275 pcs.
- Total amount of reinforcing steel to be processed approx. 950 t;
- Masonry for non-load-bearing walls approx. 440 m
- Start of execution September 1st, 2021;
- Shell completion 4.2.2022.