Heating and cooling systems for new building with canteen, DESY, CTA Science Data Management Centre
Manufacture, delivery and assembly of:
Heating systems consisting of:
- heat generation
- heat distribution network
- Thermal insulation and fire protection
- space heating surfaces
Refrigeration systems consisting of:
- splitters
- district cooling transfer station 95 kW
- refill device, manual
- quantity counter
- Fire protection sealing of pipelines
- cold insulation for pipes
Others:
- Winter construction heating - air heater
Operating and monitoring the existing heating system
in the building as winter heating on the instructions of the client
- core drilling
- Bautechn. Supervision and acceptance of the systems
Heating and cooling systems for the construction of a science data management centre (SDMC) for the Cherenko Telescope Array (CTA) and a canteen.
The structure, consisting of a flat base building and an office bar arranged above and partly projecting above it.
Two identical upper floors, a ground floor and a partial basement. The office workstations of the CTA SDMC are located on the upper floors, while the meeting room, the canteen with dining room with adjoining rooms (kitchen) and central building services areas (e.g. ventilation center) are located on the ground floor.
The building is accessed via two staircases and a lift.
The gross floor area of all levels is approximately 2,800 m².
The building exterior dimensions are approximately 28.5m x 43.0m for the EC body and approx. 17.5m x 44.5m for the OG body. The storey heights are approximately 4.40m for the ground floor and 3.15m for the 1st and 2nd floors respectively.
Heating and cooling systems for new building with canteen, DESY, CTA Science Data Management Centre
Manufacture, delivery and assembly of:
Heating systems consisting of:
- heat generation
- heat distribution network
- Thermal insulation and fire protection
- space heating surfaces
Refrigeration systems consisting of:
- splitters
- district cooling transfer station 95 kW
- refill device, manual
- quantity counter
- Fire protection sealing of pipelines
- cold insulation for pipes
Others:
- Winter construction heating - air heater
Operating and monitoring the existing heating system
in the building as winter heating on the instructions of the client
- core drilling
- Bautechn. Supervision and acceptance of the systems