Interior plastering and drywall work
Interior plastering and drywall work for the extension of the Marta-Schanzenbach-Gymnasium with the following services:
Acoustic ceiling with metal substructure approx. 66 m²
Acoustic ceiling system with low-frequency absorber approx. 377 m²
Deckenfries GK ca. 61 m²
Wall cladding made of gypsum board, single layer approx. 327 m²
Facing shell, sound insulation approx. 212 m²