The object of the order is the planning services of
— technical equipment planning — heating/ventilation/plumbing (HLS) (lot 1),
— Technical equipment planning — electrical engineering (ELT) (lot 2).
Planning services are divided into 2 lots. An application is allowed on only one lot as well as for multiple/all lots.
Specialist planning of the technical equipment - heating / ventilation / sanitation (HLS)The object of the contract is the
Planning services for the following HOAI service profiles:
- Technical equipment HLS (§§ 53 ff. HOAI).
Service phases 1 to 9,
For:
- System group 1 (sewage and water systems excluding gas systems),
- Plant group 2 (heat supply plants),
- Plant group 3 (ventilation systems),
- Plant group 8 (building automation for HLS).
Construction of a new replacement building with 10 multifunctional classrooms.
In order to be able to cover the future additional requirements for rooms at the Albert Schweitzer/Schiller School, the current OGS building in the form of a single-storey pavilion (approx. 250 m
The replacement new building is planned as a border development, taking advantage of the spatial conditions. An extension to the new gym is thus avoided.
The parameters listed above and the functionally structured areas thus result in the building structure following the function.
The approx. 1,200 m
The building connects to the old gymnasium, runs parallel to the new gymnasium, thus closing the border area with the cemetery in a north-eastern direction.
A cross-storey, upstream filigree glass façade (e.g. mullion transom construction) is intended to characterise the main entrance area, which links to the old gym like a “joint” between the two gymnasiums.
The classrooms are accessed via a laterally arranged corridor area, which also ends with a filigree steel-glass construction to the courtyard. In accordance with the neighbouring buildings, the building should also be given a flat roof.
Structural steel elements, clear functional shapes with continuous window facades and a predominantly bright colour scheme — a light and transparent clear colour scheme
The design language is intended to form the relevant stylistic devices.
Construction costs (KG 300 + 400 + demolition) are estimated at around EUR 2.8 million (gross). Completion is scheduled for autumn 2023.
Specialist planning of technical equipment - electrical engineering (ELT)The object of the contract is the
Planning services for the following HOAI service profiles:
- Technical equipment ELT (§§ 53 ff. HOAI).
Service phases 1 to 9,
For:
- system group 4 (high-voltage systems),
- Plant group 5 (telecommunications and information technology plants),
- Plant group 6 (conveyor systems),
- Plant group 8 (building automation for ELT).
Construction of a new replacement building with 10 multifunctional classrooms.
In order to be able to cover the future additional requirements for rooms at the Albert Schweitzer/Schiller School, the current OGS building in the form of a single-storey pavilion (approx. 250 m
The replacement new building is planned as a border development, taking advantage of the spatial conditions. An extension to the new gym is thus avoided.
The parameters listed above and the functionally structured areas thus result in the building structure following the function.
The approx. 1,200 m
The building connects to the old gymnasium, runs parallel to the new gymnasium, thus closing the border area with the cemetery in a north-eastern direction.
A cross-storey, upstream filigree glass façade (e.g. mullion transom construction) is intended to characterise the main entrance area, which links to the old gym like a “joint” between the two gymnasiums.
The classrooms are accessed via a laterally arranged corridor area, which also ends with a filigree steel-glass construction to the courtyard. In accordance with the neighbouring buildings, the building should also be given a flat roof.
Structural steel elements, clear functional shapes with continuous window facades and a predominantly bright colour scheme — a light and transparent clear colour scheme
The design language is intended to form the relevant stylistic devices.
Construction costs (KG 300 + 400 + demolition) are estimated at around EUR 2.8 million (gross). Completion is scheduled for autumn 2023.