Construction work for buildings relating to law and order | Tenderlake

Construction work for buildings relating to law and order

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 June 2023
Closing Date:
17 July 2023
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DEA35 Coesfeld (DE Germany/DEUTSCHLAND)
Description:
Reconstruction and extension of the town hall shell, scaffolding, façade

Reconstruction and extension of the town hall - shell, scaffolding, façade

The project will be built in two major construction phases. First of all, in the northern area

of the construction site, the new building was erected. After the relocation of the administration from the directly southern

This old building will then be partially demolished, expanded, and finally connected to the new building.

BUILDING - BUILDING CONSTRUCTIONS

founding

The building will be flat on reinforced concrete base slabs with thickenings for strip and point fdunaments

founded. The new building will have a partial basement to accommodate the building services. The

The lower area is sealed by a WU construction. In the area of the connection of old and

The new building will be underpinned using the HDI jet jet method.

Exterior and interior walls

The load-bearing exterior walls are built as reinforced concrete walls in the area of the northern new building and as

KS-MW walls created in the area of the southern extension. The old building is made of brick or brick.

KS masonry.

The staggered floor will be built in the transition between the old and new buildings in timber panel construction.

The building will be equipped with a façade of light, grey-beige facing masonry and prefabricated elements made of

colored concrete, which take up the horizontal structure of the original old building.

Exterior doors and windows

An aluminium mullion and transom construction is planned for the foyer. All windows and doors

are designed as aluminium tubular frame elements.

The main entrance is integrated into the PR façade on the west side facing the market square. All

further exterior doors such as technical, delivery and escape doors will be installed on the south and west sides in

Light metal construction.

Interior walls

The load-bearing walls are made of reinforced concrete. The non-load-bearing walls are divided into

Masonry, timber panel construction and drywall construction created. In the area of the offices

Wall coverings made of veneered wood-based materials are used.

inner doors

Object doors made of wood-based material or steel, partly in 2-leaf design, with side lights or with

Fire protection requirements T30 or smoke-tight, partly tubular frame doors glazed.

Flooring

Cement screed is laid floating. In the area of offices, a nationwide

Underfloor heating provided. The floor coverings are linoleum, textile/hard covering, and coated

Screed as well as sanded exposed screed provided. In the foyer, the screeds are used as heating screeds

Educated.

Cover

The ceiling above the ground floor is made of reinforced concrete construction and is built on load-bearing interior and

Exterior walls as well as reinforced concrete columns are supported.

hillside ceilings

Almost the entire building will be equipped with special suspended ceilings made of clay modules with integrated

Heating and cooling function. These ceilings are provided with a clay plaster on the underside and

white coated. In the foyer, in favour of acoustic curtain ceilings with fine plaster on these ceilings

renounced.

top, roof

In new and old buildings, the roof structure is designed as purlin roof, partly with steel reinforcements.

The existing roof truss will be used to increase the sill and floor heights in the attic

completely dismantled and replaced.

Download full details as .pdf
The Buyer:
Stadt Olfen
CPV Code(s):
45216110 - Construction work for buildings relating to law and order
45223220 - Structural shell work