Solar photovoltaic modules | Tenderlake

Solar photovoltaic modules

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 May 2021
Closing Date:
07 June 2021
Location(s):
PL616 Grudziądzki (PL Poland/POLSKA)
Description:
Installation of photovoltaic cells on school buildings and other facilities owned by the Municipality of Rypin

The subject of the order is: “Installation of photovoltaic cells on school buildings and other facilities owned by the Municipality of Rypin”.

3. The object of the order is the delivery and installation of 11 pcs of solar installations in the territory of the municipality of Rypin and the town of Rypin (Municipality Office building), including, inter alia:

1) supply and assembly of 11 pcs of photovoltaic installations with a total peak power of 323.38 kWp, according to the following table:

Lp. locality, plot no, within, min. installation size (kWp)

1. Sadłowo 23 284/6, 272/2, 273/2, Sadłowo, 19,98,

2. Borzymin 5 90, Borzymin, 24,42,

3. Borzymin 14 73/1 and 73/3 Borzymin, 48,84,

4. Kowalki 29 40/1, 40/2 Kowalki, 22,20,

5. Government Old Man 13 76, 57/3, Old Man Private/Government Old Man, 16,28,

6. Kowalki 62B 81 Kowalki, 47,36,

7. Sadłowo 8A 285/4, 285/9, 284/6 Sadłowo, 37,00,

8. Kowalki 29 40/1, 40/2 Kowalki, 25,16,

9. Old man Private part 1 72/6, 72/27, 72/28 Old Town Private, 25,16,

10. Old man Private II part 72/6, 72/27, 72/28 Old man Private, 23,68,

11. Rypin, Lipnowska street 4 332/3 Rypin, 33.30.

Total 323.38.

2) installation of support structures of photovoltaic modules,

3) installation of photovoltaic panels on the structure,

4) installation of solar wiring between modules and inverter,

5) making the main installation for connecting the inverter to the main switchboard of the building,

6) installation of RDC DC switchgear,

7) installation of the inverter,

8) installation of RAC switchgear switchgear switchgear unit,

9) the performance of anti-shock protection,

10) the performance of surge protection,

11) trials, measurements, adjustment and technological start-up of the plant,

12) the execution of abbreviated post-construction documentation for each project participant and full post-construction documentation for the Ordering Party (certificates, guarantees, instructions for operation, implementation projects, set of electrical measurements, set of documents for altering the meter, documentation received from Ordering Party with red-colored corrections),

13. Connection to the PGE Distribution S.A. network with the preparation of a set of documents and confirmation of the application of the installation to the network — scans of accepted applications for the network,

14) training Users in the proper operation of the installations performed,

15) drawing up service instructions containing the necessary information on how to proceed in the event of unexpected errors in the installation,

16) Programming and commissioning of the installation,

17) replenishment of possible cavities of walls, ceilings, sealing of roofing material after passages of wires,

18) other elements included in the technical specification provided with the design documentation (Annex 8 to SWZ).

Download full details as .pdf
The Buyer:
Gmina Rypin
CPV Code(s):
09331200 - Solar photovoltaic modules