For a planned clinic extension, lines for ELT, sewage, drinking water, etc. must be relocated in the clinic as a connection to an office building.
- approx. 250 m site fence,
- approx. 70 m cable trench up to t = 1.75 m,
- approx. 22 m step trench up to t = 2.80 m,
- approx. 65 m cable trench up to t = 1.20 m,
- approx. 55 m
- remove / dispose of approx. 150 m curbs and paving stones,
- approx. 160 m
- approx. 290 m
- Break off approx. 30 m of stoneware / concrete sewer pipes,
- approx. 360 m
- approx. 340 m
- approx. 55 m
- approx. 80 m