Estricharbeiten
Construction of a timber building as a two-storey solid timber building for the replacement of the existing primary and secondary school with the following services:
The following essential services are to be offered:
• Film sealing against non-pressing water, kitchen approx. 70 m²
• Wall connection, stainless steel composite sheet, h= 20 cm approx. 70 m²
• Compensating insulation, EPS 20 mm, screed, up to 5 kN/m² approx. 3000 m²
• Impact sound insulation layer EPS 040, DES-sg, 20-2 mm, up to 5 kN/m² approx. 3100 m²
• Impact sound insulation layer EPS 040, DES-sg, 40-2 mm, up to 5 kN/m² approx. 3250 m²
• PE film, 2-layer, 0.2 mm, under screed approx. 6350 m²
• Concrete C20/25, D=40 mm ca. 3600 m²
• Floating screed as heating screed,
CT-C50-F6-S79, height 61 to 63 cm, 5 KN/m² approx. 6000 m²
• Allowance for tenary rapid cement, 7 - 14 days approx. 2600 m²
• Revisionsöffnungen, 1000 x 1000 mm, F90 10 St
• Edge insulation strips, adjustments, joints, processing of installation parts, etc.