Contract Value:
DKK 170M - 170M
Notice Type:
Contract Notice
Published Date:
01 April 2022
Closing Date:
13 April 2022
Location(s):
DK DANMARK (DK Denmark/DANMARK)
Description:
Re-routing of 26 km 30” 80 bar Gas Pipeline, West Funen, Denmark

The decommissioned pipeline and stations will be removed by another contractor. The scope of work comprises the following main activities.

1) Design and construction of approximately 26 km new 30” 80 bar Gas Transmission Pipeline.

2) Design and construction of 3 new Line Valve Stations.

3) Design and construction of cable duct and fibre optical cable along 26 km pipeline including inspection wells for each 5 km.

4) Design and construction of approximately 400 m new 30” 80 bar Gas Transmission Pipeline at Blommenslyst.

5) Tie-in of the new pipeline sections to the existing Gas Transmission System at 4 locations (TP1-2-3-4).

For further details concerning the scope of work the Contracting Authority refers to General Re-quirements (doc.21/08999-02) and Design report (doc. 21/08999-01). The languages of this tender are Danish and English. All tender documents are available in English, however the authentical version of the Design report is the Danish version.

The Danish government has decided to build a new highspeed electrified railway on West Funen. The new railway track shall be in a ‘transport corridor’ and will be build alongside the existing motorway E20 between Middelfart and Odense. The existing gas transmission line is in that corridor hence the pipeline must be re-routed North of the corridor. The decommissioned pipeline and stations will be removed by another contractor. The scope of work comprises the following main activities.

1) Design and construction of approximately 26 km new 30” 80 bar Gas Transmission Pipeline.

2) Design and construction of 3 new Line Valve Stations.

3) Design and construction of cable duct and fibre optical cable along 26 km pipeline, including inspection wells for each 5 km.

4) Design and construction of approximately 400 m new 30” 80 bar Gas Transmission Pipeline at Blommenslyst.

5) Tie-in of the new pipeline sections to the existing Gas Transmission System at 4 locations (TP1-2-3-4).

For further details concerning the scope of work the Contracting Authority refers to General Requirements (doc.21/08999-02) and Design report (doc. 21/08999-01). The languages of this tender are Danish and English. All tender documents are available in English, however the authentical version of the Design report is the Danish version.

Download full details as .pdf
The Buyer:
Energinet Teknik og Anlæg A/S
CPV Code(s):
45231000 - Construction work for pipelines, communication and power lines
45231200 - Construction work for oil and gas pipelines
45231220 - Construction work for gas pipelines
45231221 - Gas supply mains construction work