>_Objet of work: Preparatory work; demolition evacuation (roadway, curb sidewalks, gutters); pumping; earthworks; protection of searches; excavated material; supply and installation of ducts; supply and installation of ductile iron pipes, fittings and piping equipment; masonry works; backfilling; compaction and adjustment to zero level; protection against stray currents; oil change; pumping; cleaning and rinsing; pressure tests; network disinfection and samples for health verification; resuming connections to the new network; existing pipe clearance; work on fire hydrants; stamping; cutting and removal of existing pipes; connection to the existing; temporary and final rehabilitation of sidewalks and roadways; removal of old locks and burning of the remaining ones; Consolidation of works.>_la estimated date of start of execution is set for January 2, 2024
rx Aep D1 Network deviation Aep Distribution Sectors 1, 2 and 4>Sector 1: Garibaldi Street>Sector 2: Felix Faure Avenue,>Sector 4: From Place Kimmerling to Rue de la Poudrette
rx Aep D2 Network deviation Aep Distribution Sectors 3 and 5>Sector 3: From Place des Maisons Neuves to Avenue Général Leclerc,>Sector 5: From Rue de la Poudrette to the Sept Chemins roundabout