Description:
A.V.E. - New building Kreisbauhof Paderborn, roofing work

The A.V.E., self-operating district of Paderborn, is planning the construction of a central district building yard.

The planned circuit building yard should consist of the following building parts:

Double-locked operation and administration building, washroom, workshop building, vehicle hall, salt hall, carport building, bulk boxes. In addition, the following facilities should be available for future use:

brine tank, car workshop, indoor crane, lift, central wash room, in-house gas station, own heating system.

Implementation is to be done at the disposal centre

“Old ski jump” in Paderborn. The existing waste disposal centre covers an area of just under

150 hectares including access and open spaces. The new construction of the district building farm at this central location creates meaningful synergy effects between

District building yard and disposal centre, as all infrastructure facilities already exist.

The more detailed sizes can be found in the attached planning documents.

Note: GEG requirements must be met

Preliminary remarks

This SOW or offer is in

its latest version is based on:

- the SOW,

- the technical rules for planning and execution

of waterproofing with polymer bitumen and bitumen sheets

(abc of bitumen sheets) set up by the industry association

bitumen roofing and waterproofing membranes e.V. (vdd),

- DIN 18531 - roof waterproofing, waterproofing for non

roofs used,

- the guidelines for planning and executing

roofs with waterproofing - flat roof guidelines -,

set up by

Central Association of the German Roofing Trade e.V.,

- and the manufacturers' instructions.

The latest version of the UVV must be observed.

Alternatives to the present specification are

approved when the main offer is completed

and the equivalence of the alternative

offered materials proven in all respects

will be.

About product and system equivalence

the client alone decides.

Alternative offers must be completed separately and as such

to mark. In particular, each offer is the

include the following evidence and test certificates:

a) Detailed SOW of each position;

Manufacturer's technical leaflets, separately for all

Materials that are mentioned in the alternative.

The documents must be submitted no later than the submission date

be handed in.

b) Test certificate for resistance to flying fire

and radiant heat according to DIN 4102 part 7 and DIN EN

1187

c) test report for the issuance of a general

building inspection certificate with test report no. for

products offered.

d) Test certificate and proof of type and position assurance, e.g.

from the WSP in Aachen or BDA in Gorinchem or

equivalent.

e) Demonstration of the dynamic adhesion strength of the

therm strips of at least 6,600 N/m²

f) Proof of equivalence is the responsibility of the bidder, VOB

A 9.7 (3)

g) Proof of voluntary quality monitoring by a

state-recognized material testing institute.

h) Proof of a functioning

quality monitoring system

according to ISO 9001:2000 by certificate.

i) Warranty declaration filed with the ZVDH of 5 years for

all products, replacement materials, disposal costs and

consequential damage.

j) 5-year subsequent liability with a well-known

insurer, if the manufacturer is from different

reasons should no longer exist.

Unless otherwise described in the text, seams are

and weld shocks at least 8 cm wide over the entire surface

and press it. The tightness is due to the leakage

bitumen weld caterpillar. For strewn tracks

is it recommended to use the bitumen weld caterpillar

scatter.

The delivery of the advertised materials is, if in the

text not otherwise described, in unit prices include to

take into account.

Bulk information is non-binding and must be submitted by

vendors are checked.

If slope insulation materials are used, the

heat transfer coefficient according to DIN EN ISO 6946 and

to calculate and prove DIN EN 832. It's the

to observe the principles of the Energy Saving Ordinance

Before submitting a tender, the bidder has discharged from the

to convince localities. Supplements that are

ignorance of the construction site, will not

remunerated separately.

A common measurement after completion of the work

is envisaged. The masses determined are used for

binding on both sides.

The acceptance takes place in accordance with VOB/B § 12 as a formal

acceptance.

The advertised roof construction and/or

Sealing systems are system structures or components

of it. The products, fabrics and sealing layers are in

quality, composition, texture and

mutual compatibility.

The permanent function of the roof layer package allows

through regular, annual inspection of the roof surfaces

ensure

Download full details as .pdf
The Buyer:
Abfallverwertungs- und Entsorgungsbetrieb Kreis Paderborn
CPV Code(s):
45261410 - Roof insulation work