pipeline construction, shaft structures, high-tank construction - structural part, well structures including installation
Lot 1: Line construction from branch shaft to planned Unterbalbach raised tank- single line DN 150 GGG ZMU, l = approx. 625 m
- 2 parallel cables DA 110 PE and DA 75 PE, l = approx. 200 m
- 2 parallel pipes DN 150 GGG ZMU and DA 75 PE, l = approx. 300 m
Of which on the section of l = approx. 45 m
two more cables per DN 200 GGG ZMU
- new construction of 1 branch shaft
- new construction of 1 water meter shaft
- new construction of 1 interim shaft
Sewer pipes with shafts:
- DN 250 PP, l = approx. 75 m
- DN 150 PP, l = ca. 295 m
- new construction of 11 sewage shafts
Other conduction work:
- double conduit, l = approx. 1,450 m
- earthworks for 1,450 m cable laying
- 1 cable pull chute
Lot 2: Unterbalbach raised tank - structural partElevated tank with 2 water chambers of 250 m³ each with tubular storage and electric room:
approx. 370 m³ reinforced concrete work
approx. 305 m² sealing with thermal insulation
approx. 5,000 m³ of earth excavation, - backfill
approx. 75 m² façade cladding
approx. 260 m² painting and plastering work
approx. 160 m² tiling
Metal construction and locksmith work:
stairs, railings, doors
Outdoor facilities:
approx. 280 m² paving
approx. 160 m fencing system
Lot 3: New well buildings well 3 and well 4 Lauda South including installationNew construction of two well structures with installation:
Well structure dimensions: approx. 5.6 m x 3.7 m x 3.0 m
Natural stone façade cladding
Security door outside, print door inside
Installation DN 50 - DN 150: approx. 20 m
fittings DN 65 - DN 150; approx. 25 pcs.
fountain head DN 1200:2 pcs
Well pumps: 4 pcs