Demolition and replacement of the building "Eichenhofer Weg",
Municipal road over the BAB 43, km 1,094
Demolition and replacement of the building "Eichenhofer Weg",
Setting up and clearing the construction site
Demolition of partial structure
Replacement construction:
Impacts: DIN EN 1991-2 load model LM 1
Traffic category according to DIN EN 1991-2: 2
Type of transport according to DIN EN 1991: medium distance
5-feldrig
Kreuzungswinkel: 100 gon
Width between railings: 8.50 m
Total length (reference design): 131.00 m
clear height: 9.03 m