Carpentry and parquet work Monument 1st construction phase and 2nd construction phase
Carpentry and parquet work - monument 1st construction phase and 2nd construction phase
- Box double windows wood new production: 128 pieces
- Box double windows wood restoration and conversion with new production: 35 pieces
- Single window wood restoration with new production: 11 pieces
- Single window wood restoration with new production and replacement glazing: 9 pieces
- Single window wood new production: 80 pieces
- Single window wood restoration with replacement glazing: 14 pieces
- Exterior door wood restoration and refurbishment: 7 pieces
- Interior door wood restoration: 38 pieces
- Exterior door new wood frame construction: 2 pieces
- Interior door new wood UZ 1-flg: 164 pieces
- Interior door new wood UZ 1-flg EI30: 40 pieces
- Interior door new wood UZ 1-flg EI90: 1 piece
- Interior door new steel UZ 1-flg EI30: 1 piece
- Interior door new steel UZ 1-flg EI90: 1 piece
- Access and weather protection wood, UK in openings: 225m2
- Refurbishment of parquet flooring stairwell: 3 pieces
- Refurbishment of wooden steps staircase: 36 pieces
- Refurbishment and reinstallation of floorboards: 65m2
- Balcony/terrace floor larch board: 1.5m2