Construction of a new workshop building for the departments of construction, painting and personal care north of the existing workshop building. The new building will be built as a reinforced concrete solid construction with ETICS façade and wood-aluminium element windows according to valid EnEV with flat roof construction.
approx. 410 m wrestling earth, round wire stainless steel V4A
approx. 270 running metres of foundation soil St/tZn, flat strip
approx. 620 running metres discharge St/tZn, flat strip
approx. 170 running metres safety line
approx. 4 pcs. connection flags stainless steel V4A
ca. 12 St. Tiefenerder
approx. 190 pcs. Connection clamps for grid mat
approx. 20 sqm mesh mat
approx. 190 running metres aluminium round wire