The subject of the Order is the preparation of design documentation, execution of site works and commissioning of the cooling water pump system after completion of modernization works and acceptance measurements in accordance with the detailed scope and requirements contained in the ToR. The purpose of modernization is to improve the efficiency of cooling water pumps and adapt it to the current operating conditions of the power plant by providing an appropriate range of pump regulation. Capacity control will be implemented by changing the angle of the blades. The Employer reserves the obligation for the Contractor to personally carry out works related to the development of the Basic and Executive Design in the field of pumps (not applicable to the development of the I&C, electrical and construction design) and the execution of the pumps.
The subject of the Order is the preparation of design documentation, execution of site works and commissioning of the cooling water pump system after completion of modernization works and acceptance measurements in accordance with the detailed scope and requirements contained in the ToR. The purpose of modernization is to improve the efficiency of cooling water pumps and adapt it to the current operating conditions of the power plant by providing an appropriate range of pump regulation. Capacity control will be implemented by changing the angle of the blades. The Employer reserves the obligation for the Contractor to personally carry out works related to the development of the Basic and Executive Design in the field of pumps (not applicable to the development of the I&C, electrical and construction design) and the execution of the pumps.