outdoor facilities
The BLB Duisburg is planning to build a regional training center (RTZ) for the Duisburg police on the property Hoffsche Straße 220-246
The advertised services relate to the following services:
sewer construction work, sewage and rainwater; Laying of supply lines: electricity, empty conduit route for IT; Earthwork:
Manufacture of road, canal and supply, landscaping; production of surfaces; Dismantling and Miscellaneous:
Connecting pipes up to DN 150, PP: length = approx. 300 m; pipes/pipes up to DN 250, PP: length = approx. 95 m
Pipes up to DN 500, concrete: length = approx. 5 m
After completion, the entire drainage network of the property is to be documented with a TV inspection (DN 150 to DN
500):Length = approx. 1200 m ; Conduits DN100 (2-4 speed)Length = approx. 790 m; cable ducts: approx. 20 pcs
Power cable (lighting) NYY 5x4mm2: length = approx. 550 m; earthworks: approx. 4,500 m3; Removal to Z2 to Laga approx. 3,800 m3
Asphalt surface: approx. 2,200 m2; Paving area (composite, RE, lawn grids, slabs):approx. 3,500 m2
Road drains approx. 20 pcs On-board facilities approx. 900 m Lawns: approx. 4,100 m2 Water-bound path surface approx. 900 m2