Purchase of 2 zero-emission electric buses with the necessary charging infrastructure to provide service to the downtown area in Kędzierzyn-Koźle – stage II - II procedure

The subject of the order includes:

1) delivery of 2 brand new low-floor city buses with electric drive (...)

2) delivery, assembly, connection and first commissioning of a brand new, mobile charger

wired, two-station with a power greater than or equal to 80 kW (...)

3) delivery, assembly, connection and first commissioning of 2 pieces of brand new chargers

pantograph (along with the design and execution of construction works aimed at the creation of modern public transport road charging infrastructure for the needs of charging electric buses). (...)

4) development and implementation of a management system for plug-in and pantograph chargers

5) training, warranty and post-warranty service: EV12 buses, plug-in chargers, chargers

pantografowych i SMPŁ.

A detailed description of the subject of the contract can be found in the content of the SWZ together with attachments.

The subject of the order includes:

1) delivery of 2 pieces of brand new city buses, low-floor, with electric drive with

total length, ranging from 11.8 meters to 12.20 meters, hereinafter referred to as EV12 buses

or buses,

2) delivery, assembly, connection and first commissioning (and, if necessary, design

and obtaining all permits) of one brand new, mobile wired charger,

two-station power greater than or equal to 80 kW (2x40 kW), providing the possibility of charging one

EV12 bus with a power of 80 kW or two buses simultaneously with a power of 40 kW each, hereinafter referred to as the charger

Plug-in or wired charger

3) design and execution of construction works in accordance with Article 103(2) and (3) of the PPL, the purpose of which is

creation of modern charging infrastructure for road public transport, for the needs of charging

electric buses, i.e.:

a) designing the foundation and connection, obtaining a building permit and exercising supervision

author's work on construction works related to the construction of the necessary infrastructure for the needs of

delivery and assembly of 2 brand new pantograph chargers (electrical and road industry), each

with a rated power equal to 250 kW, hereinafter referred to as 'pantograph chargers',

b) delivery, assembly, connection and first commissioning of 2 pieces of brand new chargers

pantografowych,

4) development and implementation of a management system for plug-in and pantograph chargers, hereinafter referred to as

Loader Operation Monitoring System (hereinafter referred to as "SMPŁ"),

5) training, warranty and post-warranty service: EV12 buses, plug-in chargers, chargers

pantografowych i SMPŁ.

A detailed description of the subject of the contract shall be specified in particular by:

1) Appendix No. 7 to the SWZ – Draft Provisions of the Agreement, including Appendix No. 1 to the Drafted

contractual provisions (WARRANTY SERVICE CONDITIONS),

2) Annex 8 to the SWZ – Description of the subject of the contract – DETAILED REQUIREMENTS FOR BUSES

for EV12 buses,

3) Annex 9 to the SWZ – Description of the subject of the contract – DETAILED REQUIREMENTS for the charger

przewodowej Plug-in,

4) Annex 10 to the SWZ – Description of the subject of the contract – Formal requirements for design

foundation and connection, obtaining a building permit and for exercising author's supervision over

construction works for the construction of the necessary infrastructure for delivery and assembly 2

units of brand new pantograph chargers and other technical documentation requirements,

5) Annex 11 to the SWZ – Description of the subject of the contract – DETAILED REQUIREMENTS for chargers

pantographs for delivery, assembly, connection and first commissioning of 2 brand new units

pantograph chargers,

6) Annex 12 to the SWZ – Description of the subject of the contract – Requirements for the Work Monitoring System

chargers (SMPŁ),

7) Annex 13 to the SWZ – Functional and Utility Program (for the purchase of 2 electric buses

zero-emission with the necessary vehicle charging infrastructure to ensure the service of the area

downtown in Kędzierzyn-Koźle – stage II),

8) Annex 14 to the SWZ – List and route of public transport lines

and transport work to which the purchased EV12 buses will be principally directed,

9) Annex 15 to the SWZ – Detailed description of EV12 buses offered by the Contractor,

10) Annex 16 to the SWZ – Detailed description of the Plug-in charger offered by the Contractor,

11) Annex 17 to the SWZ – Detailed description of pantograph chargers offered by the Contractor,

12) Annex 18 to the SWZ – Detailed description of the Work Monitoring System offered by the Contractor

Chargers.

available on the Ordering Party's website, constituting an integral part of the SWZ and the content of the SWZ.

Download full details as .pdf
The Buyer:
Gmina Kędzierzyn-Koźle, Urząd Miasta, Wydział Zamówień Publicznych
CPV Code(s):
31158000 - Chargers
34144910 - Electric buses
45311100 - Electrical wiring work
48000000 - Software package and information systems