Erlanger Stadtwerke AG has built an administration building with 3 floors and a technical building in the Erlangen bus depot. Within the framework of the present award procedure, landscaping work will be put out to tender.
The entire measure is awarded on the basis of the Law Against Restrictions on Competition (GWB) and the Sector Ordinance (SektVO) in the open procedure, taking into account the 20% quota for non-EU-wide award procedures.
The main dimensions for the present trade open facilities are:
- approx. 320 m² of concrete pavement and store it for reuse
- approx. 535 m shelves and edgings
- Lay approx. 1,560 m² of concrete pavement
- ca. 300 m² Asphaltarbeiten (Halbstarre Deckeschicht)
- approx. 880 m³ frost protection, gravel base layer
- approx. 30 m drainage channel
- approx. 11 bicycle racks deliver and set
- approx. 60 running metres of fencing
- ca. 200 m² Vegetationstechnische Bodenarbeiten
- approx. 17 tree plants
- approx. 160 m sewage pipes
- approx. 2 inspection shafts
- ca. 95 m³ Regenrückhaltung
- approx. 2 backflow flaps in the finishing shaft
- approx. 850 m³ trenches and excavation
- approx. 430 m³ excavated earth
- ca. 320 m³ Liefermaterial
- dismantle approx. 50 m pipelines
- approx. 700 m empty conduits up to DN 110
- lay approx. 1500 m of cable provided by the customer
- approx. 5 plastic shafts
- approx. 5 cable ducts