Waste with codes:
- 19 08 01 - screenings,
- 19 08 02 - sandpit content.
They arise as a result of mechanical sewage treatment at the following sewage treatment plants in Otwock:
1. Catchment station for sewage delivered - screenings, content of sand traps,
2. Sewage pumping station - screenings,
3. Two-chamber sandbox - content of sandboxes,
4. ZKF facilities - screenings.
II. Scope of service: Sewage treatment plant:
As part of the service you should propose and organize:
1. Selection of waste containers taking into account their place of origin,
2. continuous exchange and substitution of containers,
3. Waste collection by a self-loading vehicle,
4. Transport of waste from the sewage treatment plant to the development site (through processing, outside storage).
Waste with codes:
- 19 08 01 - screenings,
- 19 08 02 - sandpit content.
They arise as a result of mechanical sewage treatment in the following sewage treatment plants in Otwock:
1. Catchment station for sewage delivered - screenings, content of sand traps,
2. Sewage pumping station - screenings,
3. Two-chamber sandbox - content of sandboxes,
4. ZKF facilities - screenings.
II. Scope of service: Sewage treatment plant:
As part of the service, you should propose and organize:
1. Selection of waste containers taking into account their place of origin,
2. continuous exchange and substitution of containers,
3. Waste collection by a self-loading vehicle,
4. Transport of waste from the sewage treatment plant to the development site (through processing, outside storage).
Scope of service Sewage pumping station ul. Otwock in Karczew:
As part of the service, you should propose and organize:
1. Waste collection by a self-loading vehicle,
2. Transport of waste from the sewage pumping station ul. Otwock in Karczew to the place of development (through processing, outside storage).
3. The Employer shall provide appropriate containers for waste taking into account the place of its creation due to the need to reduce the odor nuisance of the above. waste.
III. Method and frequency of waste collection: Sewage treatment plant directly from under the equipment, i.e. after filling the filled containers for screenings, content of sand traps, they are exported to the place of processing and development.
Before submitting the offer, carefully read the terms of waste collection, select containers suitable for the building capacity of the sewage pumping station, catchment station and sandbox at the sewage treatment plant in Otwock, and ensure container replacement and collection within 24 hours of telephone notification, with continuous operation of equipment (7 days a week, 24 hours a day).
Waste collection method and frequency: Sewage pumping station ul. Otwock in Karczew
After filling the containers for screenings, provided by the Employer, they are exported to the place of processing and development.
Before submitting your offer, you should carefully read the conditions for waste collection and ensure their collection within 24 hours of telephone notification, with continuous equipment operation (7 days a week, 24 hours a day).
Waste with the code:
- 19 08 01 - screenings.
It is also being built in the sewage pumping station at ul. Otwock in Karczew (approximately 3 km from the sewage treatment plant in Otwock).