Civil engineering; Cable line construction; Fiber optic assembly; Building construction (POP container);
PG3: POP area 02 Dähre, Diesdorf, Kuhfelde, Wallstawe and Rohrberg and POP area 03 Diesdorf, Jübar, Rohrberg and Dähre
The AG intends to implement FTTB broadband connections for the blank spots in these municipalities with a next-generation network (NGA network). The establishment of the passive network in the following structure is planned:
FTTB connection of approx. 1 140 home connect buildings, approx. 1 140 home passed, 2 POP locations, 77 passive power stations, approx. 190 km of underground roads, protective pipes and protective pipe associations and fiber optic cables.
Broadband expansion in project area 3, section 3Civil engineering; Cable line construction; Fiber optic assembly; Building construction (POP container);
PG3: POP area 02 Dähre, Diesdorf, Kuhfelde, Wallstawe and Rohrberg and POP area 03 Diesdorf, Jübar, Rohrberg and Dähre
The AG intends to implement FTTB broadband connections for the blank spots in these municipalities with a next-generation network (NGA network). The establishment of the passive network in the following structure is planned:
FTTB connection of approx. 1140 home connect buildings, approx. 1 140 home passed, 2 POP locations, 77 passive power stations, approx. 190 km of underground roads, protective pipes and protective pipe associations and fiber optic cables.