Quantity surveying services | Tenderlake

Quantity surveying services

Contract Value:
EUR 53K - 62K
Notice Type:
Contract award notice
Published Date:
01 February 2021
Closing Date:
Location(s):
IE IRELAND
Description:
Quantity Surveying Services for Additional Accommodation at CBS, Mitchelstown

Quantity surveying services for additional accommodation at CBS, Mitchelstown, Co. Cork. CBS Mitchelstown is a voluntary secondary school under the trusteeship of the Edmund Rice Schools Trust.

Please see attached project brief and schedule of additional accommodation

In summary, the project will comprise:

Section A:

• 1 x technologies prep room 58.6 m2 each;

• 1 x DCG room 88.6 m2;

• student and staff toilets 8 m2;

• locker space 72 m2.

Giving a floor area incl circulation and internal walls of: 201 m2.

Section B:

• 3 classroom SEN base 507 m2;

• giving a floor area (incl. circulation and internal walls of 649.7 m2.

Giving a gross floor area for Section A and B (including circulation, internal walls and stairs 951 m2).

Also:

• Secure hard and soft play area 200 m2;

• sensory garden 100 m2;

• 9 parking spaces.

Also:

• demolition of existing prefab 100 m2.

Quantity surveying services for additional accommodation at CBS, Mitchelstown, Co. Cork. CBS Mitchelstown is a voluntary secondary school under the trusteeship of the Edmund Rice Schools Trust.

Please see attached project brief and schedule of additional accommodation

In summary, the project will comprise:

Section A:

• 1 x technologies prep room 58.6 m2 each;

• 1 x DCG room 88.6 m2;

• student and staff toilets 8 m2;

• locker space 72 m2.

Giving a floor area incl circulation and internal walls of: 201 m2.

Section B:

• 3 classroom SEN base 507 m2;

• giving a floor area (incl. circulation and internal walls of 649.7 m2.

Giving a gross floor area for Section A and B (including circulation, internal walls and stairs 951 m2).

Also:

• Secure hard and soft play area 200 m2;

• sensory garden 100 m2;

• 9 parking spaces.

Also:

• demolition of existing prefab 100 m2.

Interim temporary accommodation

• Please note: once appointed, the Design Team (DT) will be tasked with the provision of interim temporary accommodation (100 m2), including all required statutory approvals and compliances, to be used by the school until such time that the permanent structure has been completed. The DT are to ensure that the location of the interim temporary accommodation does not impede the development of the permanent additional accommodation.

Awarded to:
Architectural Services for Additional Accommodation at CBS, Mitchelstown
John J Casey and Co., Cork (IE)
Download full details as .pdf
The Buyer:
CBS secondary school (Mitchelstown)
CPV Code(s):
71324000 - Quantity surveying services