New rake cleaning machines, including steel construction, are to be built at the Herne-Ost, Wanne-Eickel, Gelsenkirchen and Oberhausen pumping stations.
A new rake cleaning machine is to be built at the Duisburg pumping station, where the steel construction will be preserved.
Repair and renewal of the computer cleaning machines on the Rhine-Herne Canal
Automatically controlled rake cleaning machines with rope-guided gripper.
Travel up to 45 meters, depending on the system.
Load capacity approx. 1000 kg.
- Delivery, assembly and commissioning of new trolleys with drive incl.
Pulley
- Delivery, assembly and commissioning of a new gripper for the computer systems.
- delivery, assembly and commissioning of a new maintenance car and
maintenance platforms.
- Replace hydraulic lines, connections and drive components.
- Delivery, assembly and commissioning of computer equipment electrical engineering.
- Delivery, installation and commissioning of fence systems around the movable
components and the container
- Delivery, assembly and commissioning of the steel structure and roadway including new joining materials
- Delivery, assembly and commissioning of container turning devices