Painting, tile work, flooring work, sports flooring, impact wall.
Lot 11 painting work - award no. 21 VOB 038The listed East School is located on the property at Karl-Liebknecht-Strasse 56 in Gera. This will be extensively renovated and rebuilt.
At the same time, a 1.5-fold sports hall is being built. Painting work is to be carried out for this new building.
The following rough quantities should be carried out:
- masking 280 square meters with foil,
- 850 sqm floor coverage,
- 2,000 square meters of primer inner wall, height up to 8.0 m,
- 2,000 square meters of paint coating on the inner wall,
- 850 qm primer ceiling plasterboard / reinforced concrete,
- 850 sqm color coating ceiling plasterboard / reinforced concrete,
- 150 sqm floor coating epoxy resin.
Rough dates:
- Painting work on the ground floor: August / September 2021,
- Painting work upper floor: September / October 2021,
- Completion work painter: December 2021 / January 2022.
Lot 12 tile work - award no. 21 VOB 039- Finely fill 150 square meters of wall surfaces,
- 360 sqm underground Tiefengrund,
- 360 sqm coating insulation walls,
- 360 sqm wall tiles,
- 70 qm spreader, colored,
- 110 sqm floor tiles,
- 180 running meters of base tile,
- Tile in 10 pieces of mirrors,
- 250 running meters permanently elastic grouting,
- 350 running meters. top grouting tile covering.
Lot 13 flooring - award no. 21 VOB 040- Prepare 320 sqm sub-floor cement screed,
- Laying 320 square meters of linoleum flooring, monochrome, 2.5 mm,
- 350 running meters of skirting board, laying wood,
- Cover 44 stair steps with linoleum,
- Prepare 190 sqm sub-floor cement screed for laying parquet,
- Laying 190 sqm parquet upright lamella, oak 23 mm,
- Sanding and sealing 190 square meters of parquet,
- Lay 100 running meters of skirting board wood, oak.
Lot 14 sports flooring - award no. 21 VOB 041- 650 sqm cement screed as composite screed,
- 650 sqm sports floor construction,
- 650 sqm linoleum sports floor covering,
- 650 sqm initial care and sealing,
- 18 pieces of installation device sleeves,
- 600 running meters of field markings,
- Prepare 96 sqm sub-floor equipment rooms,
- 96 square meters of linoleum sports flooring in the equipment room,
- 96 sqm initial care and sealing,
- 160 running meters of skirting board.
Lot 16 impact wall - award no. 21 VOB 042- 216 sqm ball impact resistant acute impact wall cladding,
- 109 running meters of ball rolling board up to 300 mm,
- 109 lm skirting board,
- 14 pc recesses,
- 2 access door elements 210/246 cm,
- 2 access door elements 152/246 cm,
- 14 inspection doors 30/30 cm ... 40/40 cm,
- 2 pieces of equipment locker doors 300/246 cm,
- 2 pieces of equipment locker doors 400/246 cm,
- 2 x sports hall interior windows 180/150 cm.