SEMADS is launching a tendering procedure to designate the contractors responsible for carrying out the rehabilitation and construction of the "Foyer de la Solitude", which covers 9,424 m2 of land. The purpose of the project is the creation of a 5-star hotel with 83 rooms including a gourmet restaurant and a SPA with swimming pool. They include the rehabilitation of the existing building called "Hearth of Solitude" (with a floor area of 1,640 m
5 651 m
- lot 1: site installation,
- lot 2: carcass work, timber frame,
- lot 4: sealing,
- lot 5: acoustic screed,
- lot 6: green spaces.
- lot 7: external metal joinery,
- lot 8: facade cladding,
- Lot 9: exterior locksmithing.
- lot 10: exterior woodwork,
- Lot 11: renovation,
- Lot 12: Locksmithing, exterior ironwork,
- lot 13: cover,
- Lot 14: Canopy.
- lot 15: HVAC smoke extraction,
- lot 16: plumbing,
- lot 17: high current electricity,
- lot 18: low current electricity,
- lot 19: SSI,
- lot 20: elevators,
- lot 21: kitchen equipment,
- lot 22: swimming pool,
- Lot 23: partitions, doubling.